CONDITIONS AND TERMS
GROUND SCREW PILE
Installation of ground screw piles is made after project calculation. We will choose the most simple method, exactly for your object.:

The manual mounting method with using nozzle and profile pipe-levers. This method allows to twist geo-screws of average length up to 4 meters;

Electromechanical method of using "electric drive";

Hydraulic attachments are mounted on the basis of special equipment: cranes, loaders, tractors and self-propelled drilling rigs. The use of this method is possible provided that such types of equipment are accessible to the territory. With this method, it is possible to mount geo-screws up to 8 meters in length.

Lead Time: 3 business days for any method and object.
SLIDING GATES
We are in LUXFERRUM always choose:
— Delivery of automatic gate kits
— Complete complex producing and installation sliding gates for saving your time and money

Lead Time: 5 working days.
STAGES OF INSTALLATION
Prepare
input data
Develop of design documentation
Produce
the products
Installation works on the object
Hand over
the work
Close
Chat with us
WhatsApp
Viber
© All rights reserved
10 Drugkivska str.,
Kyiv, Ukraine, 03113